<?xml version="1.0" encoding="UTF-8" ?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
<!--
  This web page is actually a data file that is meant to be read by RSS reader programs.
-->
<channel>
<atom:link href="https://www.stmaryspurton.org.uk/334/xml/" rel="self" type="application/rss+xml" />
<title>www.stmaryspurton.org.uk</title>
<link>https://www.stmaryspurton.org.uk:443</link>
<description>News for www.stmaryspurton.org.uk</description>
<language>en-gb</language>
<lastBuildDate>Sat, 19 Feb 2022 15:17:24 +0000</lastBuildDate>
<copyright>Copyright: (C) St Mary&#039;s Church</copyright>
<ttl>15</ttl>

<item>
<title>Photos - completed work</title>
<guid isPermaLink="false">stmaryspurton_17851</guid>
<pubDate>Sat, 19 Feb 2022 15:17:24 +0000</pubDate>
<description><![CDATA[<p>&nbsp;</p>
<p><img src="/_data/site/43/pg/376/PXL_20211023_144037048.jpg" width="300" /></p>
<p>Patch repairs to decayed stonework - Example 2</p>
<p><img src="/_data/site/43/pg/376/PXL_20211027_103137776.jpg" width="300" /></p>
<p>Gaps in staircase turret wall cleaned out and remortared</p>
<p><img src="/_data/site/43/pg/376/PXL_20211023_144254841.jpg" width="300" /></p>
<p>Patch repairs to decayed stonework on NE pinnacle</p>
<p><img src="/_data/site/43/pg/376/PXL_20211023_144219876.jpg" width="300" /></p>
<p>Repointing of capping stones on W parapet wall</p>
<p><img src="/_data/site/43/pg/376/PXL_20211027_103125717.jpg" width="300" /></p>
<p>&nbsp;Capping stones on N parapet after being removed/rebedded/repointed</p>
<p>&nbsp;<img src="/_data/site/43/pg/378/NewflashingaroundSEcorner.jpg" width="300" /></p>
<p>New lead flashing around SE corner</p>
<p><img src="/_data/site/43/pg/378/NewflashingonSwall.jpg" width="300" /></p>
<p>New flashing along S wall</p>
<p><img src="/_data/site/43/pg/378/RebeddedandnewflashingaroundNEcorner.jpg" width="300" /></p>
<p>Remortared and new flashing around NE corner</p>
<p><img src="/_data/site/43/pg/378/Rebeddedflashingonstaircaseturretroof.jpg" width="300" /></p>
<p>Remortared flashing on staircase turret roof</p>]]></description>
<link>https://www.stmaryspurton.org.uk:443/378/Photos---completed-work</link>

</item>
<item>
<title>Photos - Lead work in progress</title>
<guid isPermaLink="false">stmaryspurton_17850</guid>
<pubDate>Sat, 19 Feb 2022 15:17:00 +0000</pubDate>
<description><![CDATA[<p><img src="/_data/site/43/pg/377/PXL_20220212_164834930.jpg" width="300" /></p>
<p>New flashing on N wall. As for the other new flashings new chases were cut into the masonry.</p>
<p><img src="/_data/site/43/pg/377/PXL_20220212_164910950.jpg" width="300" /></p>
<p>New flashing on S wall - 1</p>
<p><img src="/_data/site/43/pg/377/PXL_20220212_164915308.jpg" width="300" /></p>
<p>New flashing on S wall - 2</p>
<p><img src="/_data/site/43/pg/377/PXL_20220212_164922365.MP.jpg" width="300" /></p>
<p>Detail of SW corner flashing</p>
<p><img src="/_data/site/43/pg/377/PXL_20220212_164843965.jpg" width="300" /></p>
<p>Detail of NE corner flashing</p>
<p><img src="/_data/site/43/pg/377/PXL_20220212_164900408.MP.jpg" width="300" /></p>
<p>Detail of SE corner flashing</p>
<p>&nbsp;<img src="/_data/site/43/pg/377/PXL_20220212_164949821.jpg" width="300" /></p>
<p>Cover strip repair - examples</p>
<p><img src="/_data/site/43/pg/377/PXL_20220212_165020613.jpg" width="300" /></p>
<p>Cover strip junction repair</p>
<p><img src="/_data/site/43/pg/377/PXL_20220212_165054894.MP.jpg" width="300" /></p>
<p>Small splits rewelded - examples</p>]]></description>
<link>https://www.stmaryspurton.org.uk:443/377/Photos---Lead-work-in-progress</link>

</item>
<item>
<title>Photos - Masonry work in progress</title>
<guid isPermaLink="false">stmaryspurton_17849</guid>
<pubDate>Sat, 19 Feb 2022 15:16:36 +0000</pubDate>
<description><![CDATA[<p><img src="/_data/site/43/pg/376/PXL_20211023_143948149.jpg" width="300" /></p>
<p>Capping stones removed on W parapet wall</p>
<p><img src="/_data/site/43/pg/376/PXL_20211023_143955269.jpg" width="300" /></p>
<p>Capping stones removed on S parapet wall</p>
<p><img src="/_data/site/43/pg/376/PXL_20211023_144103208.jpg" width="300" /></p>
<p>Capping stones removed on N parapet wall</p>
<p><img src="/_data/site/43/pg/376/PXL_20211023_144010004.jpg" width="300" /></p>
<p>Patch repairs to decayed stonework - example 1</p>
<p>&nbsp;</p>]]></description>
<link>https://www.stmaryspurton.org.uk:443/376/Photos---Masonry-work-in-progress</link>

</item>
<item>
<title>Photos - Defect examples</title>
<guid isPermaLink="false">stmaryspurton_17848</guid>
<pubDate>Sat, 19 Feb 2022 14:51:11 +0000</pubDate>
<description><![CDATA[<p><img src="/_data/site/43/pg/375/Cappingstones-lossofmortarbedding.jpg" width="300" /></p>
<p>Mortar loss in capping stone bedding making capping unstable</p>
<p><img src="/_data/site/43/pg/375/Decayedstoneworkandmortarlossbetweenstonesandaboveflashing.jpg" width="300" /></p>
<p>Decayed stonework and mortar loss&nbsp;</p>
<p><img src="/_data/site/43/pg/375/Defectivemortaronflashings.jpg" width="300" /></p>
<p>Defective mortar around lead flashing</p>
<p><img src="/_data/site/43/pg/375/PXL_20211027_103806353.jpg" width="300" /></p>
<p>Defective mortar around lead flashing</p>
<p><img src="/_data/site/43/pg/375/Mortarlossonchimneyandturretroofflashing.jpg" width="300" /></p>
<p>Defective mortar and cracking above lead flashing on chimney</p>
<p><img src="/_data/site/43/pg/375/Openjointsinturretwall-outside.jpg" width="300" /></p>
<p>Mortar loss/open joints on stair turret wall</p>
<p><img src="/_data/site/43/pg/375/Openjointsinturretwall-inside.jpg" width="300" /></p>
<p>Mortar loss/open joints on stair turret wall (inside)</p>
<p><img src="/_data/site/43/pg/375/NWpinnacleafterfinialstoneremoved.jpg" width="300" /></p>
<p>&nbsp;NW pinnacle after removal of upper stones for safety (not addressed in current contract)</p>
<p><img src="/_data/site/43/pg/375/Leadcracks-example1.jpg" width="300" /></p>
<p>Lead crack on tower roof - example1</p>
<p><img src="/_data/site/43/pg/375/Leadcracks-example2.jpg" width="300" /></p>
<p>Lead crack on tower roof - example2</p>
<p>&nbsp;</p>]]></description>
<link>https://www.stmaryspurton.org.uk:443/375/Photos---Defect-examples</link>

</item>
<item>
<title>Costs and funding</title>
<guid isPermaLink="false">stmaryspurton_13218</guid>
<pubDate>Sat, 19 Jun 2021 12:34:05 +0100</pubDate>
<description><![CDATA[<h5><strong>Costs.</strong></h5>
<p>Our initial estimate for the cost of the West Tower masonry repair project was between &pound;15,000 - &pound;20,000 (excl VAT). This included both the direct work and professional fees. As we near the end of the project (Feb 2022), this estimate has now been reduced to about &pound;13,500 following the exclusion of the pinnacle repair work (see 'What we are doing')</p>
<h5><strong>Funding.</strong></h5>
<p>We started with about &pound;1000 in our Roof Repair Fund and through local fund-raising and donations this was increased to about &pound;5000 by December 2021. In addition, we have committed &pound;3500 from money raised by the <a href="/174/The-Friends-of-St-Marys">Friends of St Marys</a>, mainly by kind and faithful donations.</p>
<p>We have also secured generous grants from the Wiltshire Historic Churches Trust&nbsp; and from the National Churches Trust for which we are very grateful. We are hopeful that with these grants to supplement the local fundraising the project will be completed without having to dip into church reserves. Any surplus will help to replenish the Roof Repair Fund where funds are always needed!</p>
<p><img src="/_data/site/43/pg/340/NCTLogowithStrapline.jpg" width="173" height="211" /></p>
<p><img src="/_data/site/43/pg/340/WHClogo.jpg" width="413" height="65" /></p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p><span style="text-decoration: underline;"><strong>How you can help</strong></span></p>
<p>If you would like to support the conservation of our beautiful village church, here are some ways you could help financially:</p>
<ul>
<li>Become <a href="/174/The-Friends-of-St-Marys">a 'Friend' of St Mary's</a>. The Friends were formed in 2003 to help raise money to maintain and restore the fabric of the Church building. Over the years they have raised many thousands of pounds, through donations and a diverse range of events, for which we are much indebted.</li>
<li>Make a direct donation:&nbsp;</li>
</ul>
<p><strong>* By bank transfer:</strong></p>
<p>&nbsp; &nbsp; Name: &nbsp; Parochial Church Council of Purton General Account</p>
<p>&nbsp; &nbsp; Sort Code: 60-21-40</p>
<p>&nbsp; &nbsp; Account: 40461629</p>
<p>&nbsp; &nbsp; Ref: West Tower</p>
<p><strong>* By cheque:</strong></p>
<p>&nbsp; &nbsp; Payee: PCC of Purton General</p>
<p>&nbsp; &nbsp; Ref (on back of cheque): West Tower</p>
<p>&nbsp; &nbsp; Post/deliver to The Vicarage, 2 Kingsacre, Hyde Lane, Purton, Swindon&nbsp;SN54DU</p>
<p><strong>* Online by <a href="https://givealittle.co/campaigns/4ec3a53c-1e00-4e7f-b6ca-ed0d44e6de5a">card</a>:</strong><strong>&nbsp;</strong><strong>&nbsp;&nbsp;</strong><a href="https://givealittle.co/campaigns/4ec3a53c-1e00-4e7f-b6ca-ed0d44e6de5a"><img src="/_data/site/43/pg/340/DonatebuttonforWestTower.jpg" width="130" height="99" /></a><strong>&nbsp;</strong></p>
<p>* or contact our <a href="/117/Berta-Legg">Treasurer, Berta Legg,</a> for other means to make a donation.</p>
<p>&nbsp;</p>
<p>Thank you!</p>]]></description>
<link>https://www.stmaryspurton.org.uk:443/340/Costs-and-funding</link>
<enclosure url="https://www.stmaryspurton.org.uk:443/cache/img/43/pg|340&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sgde63da69ce&amp;ft1624103793&amp;walletmoneycrop.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>What are we doing</title>
<guid isPermaLink="false">stmaryspurton_13215</guid>
<pubDate>Sat, 19 Jun 2021 11:17:37 +0100</pubDate>
<description><![CDATA[<p>Between September 2021 and February 2022 a contract was let to carry out repairs to the the West tower parapet walls. The parapet work involved partial removal and re-bedding of the capping stones, re-mortaring of open joints and re-bedding of lead flashings. The Diocese of Bristol gave their approval for this work to proceed. Additional lead repair work was also carried out.</p>
<p>See the following pages for photos for the <a href="/375/Photos---Defect-examples">defects </a>addressed, the <a href="/376/Photos---Masonry-work-in-progress">masonry </a>and <a href="/377/Photos---Lead-work-in-progress">lead </a>work in progress and the <a href="/378/Photos---completed-work">completed work</a>.</p>
<h3>UPDATE August 2021</h3>
<p>Tenders were received and assessed.</p>
<h5>UPDATE SEPTEMBER 2021</h5>
<p>Following tender assessment we realised that the pinnacle repair work was going to need external scaffolding to be carried out safely. As we didn't have the funds for this the scope of the contract was reduced to include only the parapet work. SK Conservation were awarded the contract with a start date in early October.</p>
<h5>UPdate October 2021</h5>
<p>Eagle-eyed passers-by will have noticed that during October a number of capping stones were temporarily removed from the parapet. This allowed for rusted clamps between the wall sections to be replaced and for the capping stones to be re-bedded more firmly. In addition, a number of wall joints were raked out and re-mortared and areas of weather-eroded stonework were repaired. The parapet repair work was substantially completed this month. The contractor was asked to quote for some additional work to install new lead flashings and to repair some splits in the old lead roof.&nbsp;</p>
<h5>UPDATE DECEMBER 2021</h5>
<p>Quotes for the lead flashing work were obtained and a sub-contrator (West Country Tiling) appointed but it was not possible to get the work done in December due to other commitments</p>
<h5>UPDATE FEBRUARY 2022</h5>
<p>The lead work was successfully completed in early February. SK Conservation then completed the mortar work associated with the new flashings and carried out final mortar repairs on the stair turret roof at the end of the month.</p>
<p>FINAL UPDATE AUGUST 2022</p>
<p>Following the 6 months 'defects' period the contract was officially signed off.</p>]]></description>
<link>https://www.stmaryspurton.org.uk:443/339/What-are-we-doing</link>
<enclosure url="https://www.stmaryspurton.org.uk:443/cache/img/43/pg|339&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg84ea9d2ffe&amp;ft1624101475&amp;Masonryrepairimage.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Why repair work is needed</title>
<guid isPermaLink="false">stmaryspurton_13214</guid>
<pubDate>Sat, 19 Jun 2021 11:17:13 +0100</pubDate>
<description><![CDATA[<p>The West Tower of St Mary's Church provides an iconic image that most Purtonians will be familiar with. This 3-storey bell tower was built in the 15th Century and has stood the test of time well over its 500 or so years. However, it is showing its age and some of the stonework needs attention both for conservation and safety reasons.</p>
<p>In the 2013 and 2018 Quinquennial Inspections our architect flagged up decay to the mortar on which the West tower parapet capping stones are bedded. On a more recent inspection in September 2020 he also identified a number of instances of failed pointing to the mortar joints of the parapet wall masonry, particularly at the junction with the parapet gutter. He recommended that all these mortar defects should be repaired within 12 months to prevent loosening of the masonry which could affect the overall integrity of the parapet structure.</p>
<p>&nbsp;<img style="display: block; margin-left: auto; margin-right: auto;" src="/_data/site/43/pg/338/IMG_20200824_121629210.jpg" width="500" height="375" /></p>
<p><strong>Part of the parapet wall showing decayed masonry and loss of mortar on joints.</strong></p>
<p>The 2018 Quinquennial Inspection also found that the upper stones on the NW pinnacle on the West tower were loose due to decayed masonry/mortar. The situation became worse in early 2020 and urgent action was taken to remove the upper stones in May 2020 so that there was no risk of any loose stones falling. The removed stones were stored for future possible reinstatement. We hope to restore this pinnacle as part of the repair work, if this is affordable.</p>
<p><img style="display: block; margin-left: auto; margin-right: auto;" src="/_data/site/43/pg/338/IMG_20200726_083638174.jpg" width="500" /></p>
<p><strong>NW pinnacle after removal of upper stones for safety</strong></p>
<p>&nbsp;</p>]]></description>
<link>https://www.stmaryspurton.org.uk:443/338/Why-repair-work-is-needed</link>
<enclosure url="https://www.stmaryspurton.org.uk:443/cache/img/43/pg|338&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sgebda4faea1&amp;ft1624098627&amp;IMG_20200824_121629210.jpg" length="100" type="image/jpg" />
</item>

</channel>
</rss>