<?xml version="1.0" encoding="UTF-8" ?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
<!--
  This web page is actually a data file that is meant to be read by RSS reader programs.
-->
<channel>
<atom:link href="https://www.stmaryspurton.org.uk/221/xml/" rel="self" type="application/rss+xml" />
<title>www.stmaryspurton.org.uk</title>
<link>https://www.stmaryspurton.org.uk:443</link>
<description>News for www.stmaryspurton.org.uk</description>
<language>en-gb</language>
<lastBuildDate>Sun, 14 Mar 2021 17:40:29 +0000</lastBuildDate>
<copyright>Copyright: (C) St Mary&#039;s Church</copyright>
<ttl>15</ttl>

<item>
<title>March 2021 Photos</title>
<guid isPermaLink="false">stmaryspurton_11348</guid>
<pubDate>Sun, 14 Mar 2021 17:40:29 +0000</pubDate>
<description><![CDATA[See the latest Church Renewal photos]]></description>
<link>https://www.stmaryspurton.org.uk:443/305/March-2021-Photos</link>
<enclosure url="https://www.stmaryspurton.org.uk:443/cache/img/43/pg|305&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg6fbfbc544d&amp;ft1615744786&amp;IMG_20210312_150707.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>February 2021 Photos</title>
<guid isPermaLink="false">stmaryspurton_11272</guid>
<pubDate>Tue, 02 Mar 2021 15:42:18 +0000</pubDate>
<description><![CDATA[<p><img src="/_data/site/43/pg/296/IMG_20210205_11260239.jpg" width="300" height="400" /></p>
<p>Testing out a layout for the new tiles on the dais. (Layout and size of tiles later rejected!) (5/2).&nbsp;&nbsp; &nbsp;&nbsp;</p>
<p><img src="/_data/site/43/pg/296/IMG_0145.JPG" width="300" /></p>
<p>The new air-conditioning unit in the ringing chamber - for warmth in winter and cooling in summer (12/2)</p>
<p><img src="/_data/site/43/pg/296/IMG_20210205_11310830.jpg" width="300" /></p>
<p>Refitting one of the three refurbished fan heaters from the old heating system (5/2)</p>
<p><img src="/_data/site/43/pg/296/IMG_20210205_11583912.jpg" width="300" /></p>
<p>&nbsp;General view of the Nave from the ring chamber (5/2)</p>
<p>&nbsp;&nbsp;<img src="/_data/site/43/pg/296/IMG_20210219_121338.jpg" width="300" /></p>
<p>&nbsp;The font, now in its new location close to the front of the Nave. Better visibility for baptisms. (19/2)</p>
<p><img src="/_data/site/43/pg/296/IMG_20210219_121834.jpg" width="300" /></p>
<p>&nbsp;At last, some proper heating behind the High Altar! (19/2)</p>
<p><img src="/_data/site/43/pg/296/IMG_20210219_124134.jpg" width="300" /></p>
<p>&nbsp;The boiler, now operational. The church has been gradually drying out and warming up after the cold spell earlier in February (19/2)</p>
<p><img src="/_data/site/43/pg/296/IMG_20210223_091008876.jpg" width="300" /></p>
<p>&nbsp;Sanding the original floorboards in the Nave prior to staining and sealing (23/2)</p>
<p><img src="/_data/site/43/pg/296/IMG_20210223_095635785.jpg" width="300" /></p>
<p>&nbsp;The old pulpit in its new location on the north wall (23/2)</p>
<p><img src="/_data/site/43/pg/296/IMG_20210224_114009196.jpg" width="300" /></p>
<p>&nbsp;The toilet area, essentially finished&nbsp; - the lobby (23/2) ...</p>
<p><img src="/_data/site/43/pg/296/IMG_20210223_095758764.jpg" width="300" /></p>
<p>&nbsp;... and the accessible toilet (23/2) ...</p>
<p><img src="/_data/site/43/pg/296/IMG_20210223_095826006.jpg" width="300" /></p>
<p>&nbsp;... and toilet two (23/2) ....</p>
<p><img src="/_data/site/43/pg/296/IMG_20210224_113942828_HDR.jpg" width="300" /></p>
<p>&nbsp;... and toilet 3 (23/2)</p>
<p><img src="/_data/site/43/pg/296/IMG_20210224_114344214_HDR.jpg" width="300" /></p>
<p>&nbsp;The repositioned Braydon monuments (previously in the NW corner of the Nave and now in the St Nicholas chapel on the south wall) (24/2)</p>
<p><img src="/_data/site/43/pg/296/IMG_20210224_115819805.jpg" width="300" /></p>
<p>&nbsp;The oak framing for the glazed screen between the Lady Chapel and the Chancel (24/2)</p>
<p><img style="background-color: #ffffff;" src="/_data/site/43/pg/296/IMG_20210225_153029907_HDR.jpg" width="300" /></p>
<p>... and the&nbsp;oak framing for the screen between the Lady Chapel and the St Nicholas Chapel (25/2)</p>
<p>&nbsp;Glass deliveries for these screens and for the Ringing Chamber screen expected in first week of March.</p>
<p><img src="/_data/site/43/pg/296/IMG_20210225_153005985.jpg" width="300" /></p>
<p>&nbsp;The dais - the timber work now complete. Carpets to be fixed and tiles laid in the central section in early March (25/2)</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>]]></description>
<link>https://www.stmaryspurton.org.uk:443/296/February-2021-Photos</link>
<enclosure url="https://www.stmaryspurton.org.uk:443/cache/img/43/pg|296&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg2bf785e786&amp;ft1614699999&amp;IMG_20210225_153005985.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>January 2021 photos</title>
<guid isPermaLink="false">stmaryspurton_10890</guid>
<pubDate>Fri, 22 Jan 2021 12:51:49 +0000</pubDate>
<description><![CDATA[<p><img src="/_data/site/43/pg/285/ThekitchenatthebackoftheSouthAisleand..jpg" width="300" /></p>
<p>The kitchen at the back of the South Aisle and &hellip;.</p>
<p><img src="/_data/site/43/pg/285/andtheservery..jpg" width="300" /></p>
<p>&nbsp;... and the servery.</p>
<p><img src="/_data/site/43/pg/285/NewdoortothenewtoiletareainthebackcorneroftheNorthAisle.jpg" width="300" /></p>
<p>&nbsp;New door to the new toilet area in the back corner of the North Aisle&nbsp;</p>
<p><img style="background-color: #ffffff;" src="/_data/site/43/pg/285/Workinprogresstofinishoffthetoilets..jpg" width="300" /></p>
<p>Work in progress to finish off the toilets ....</p>
<p><img src="/_data/site/43/pg/285/Plasteringcompletedindisabledtoilet.jpg" width="300" /></p>
<p>.... plastering completed in the accessible toilet.</p>
<p><img style="background-color: #ffffff;" src="/_data/site/43/pg/285/Westscreensteelworkinplace-waitingfordeliveryofglass.jpg" width="300" /></p>
<p>West screen steelwork in place - waiting for delivery of glass</p>
<p><img src="/_data/site/43/pg/285/Constructionofthedaisbegins.jpg" width="300" /></p>
<p>Construction of the dais begins ...</p>
<p><img src="/_data/site/43/pg/285/Workingonthedaistimberwork.jpg" width="300" /></p>
<p>&nbsp;... with lots of timberwork.&nbsp;</p>
<p><img src="/_data/site/43/pg/285/Daisshowingroundedend.jpg" width="300" /></p>
<p>A later stage in the dais construction - the 2nd step started and the oak nosings being fixed.</p>
<p><img src="/_data/site/43/pg/285/Someoftherefurbishedradiatorsreadytobeinstalled..jpg" width="300" /></p>
<p>Some of the refurbished radiators ready to be installed.</p>
<p><img src="/_data/site/43/pg/285/SomefinalbitsofplasterrepaironNorthAisle.jpg" width="300" /></p>
<p>Some final bits of plaster repair on North Aisle.</p>
<p><img style="background-color: #ffffff;" src="/_data/site/43/pg/285/LightingintheChancel-thelastareaforscaffoldremoval.jpg" width="300" /></p>
<p>Lighting in the Chancel - the last area for scaffold removal.</p>
<p><img style="background-color: #ffffff;" src="/_data/site/43/pg/285/TheNave-showingcleanedandredecoratedceilingandwalls.Alsotheilluminationfromthenewlightfittings..jpg" width="300" /></p>
<p>The Nave - showing the cleaned and redecorated&nbsp;walls above the arches and the ceiling, illuminated by the new lights.</p>]]></description>
<link>https://www.stmaryspurton.org.uk:443/285/January-2021-photos</link>
<enclosure url="https://www.stmaryspurton.org.uk:443/cache/img/43/pg|285&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg12d648c212&amp;ft1611320207&amp;TheNave-showingcleanedandredecoratedceilingandwalls.Alsotheilluminationfromthenewlightfittings..jpg" length="100" type="image/jpg" />
</item>
<item>
<title>December 2020 photos</title>
<guid isPermaLink="false">stmaryspurton_10714</guid>
<pubDate>Sat, 19 Dec 2020 18:58:59 +0000</pubDate>
<description><![CDATA[<p><img src="/_data/site/43/pg/271/1FirstcoatofplasterrepaironSwallStNick7Dec.jpg" width="300" /></p>
<p>Most large plaster repairs were done this month. This is the 1st coat of plaster repair to S wall of St Nicholas Chapel</p>
<p><img src="/_data/site/43/pg/271/22ndcoatPlasterrepaironSwallofStNicholascomp11dec.jpg" width="300" /></p>
<p>.... and 2nd coat of plaster repair to S wall of St Nicholas Chapel later in December</p>
<p><img src="/_data/site/43/pg/271/3PlasterbeingrepairedonNwallofNAislecomp11dec.jpg" width="300" /></p>
<p>Plaster being repaired on the N wall of the N Aisle</p>
<p><img src="/_data/site/43/pg/271/4RepairscompletedtowallandceilinginNEcornerofNaisle.jpg" width="300" /></p>
<p>&nbsp;Repair completed on damaged plaster on wall and ceiling in the NE corner of the North Aisle (see also November photos)</p>
<p><img src="/_data/site/43/pg/271/5Limewashinginprogress.jpg" width="300" /></p>
<p>Limewashing in progress on N wall of North Aisle. Probably the 4th coat!</p>
<p><img src="/_data/site/43/pg/271/6Hotwaterboilerfortoiletareainstalleddec07.jpg" width="300" /></p>
<p>Water heater and associated controls and pipework installed in toilet area</p>
<p><img src="/_data/site/43/pg/271/7Furtherfittingoutinnewtoiletareacomp11dec.jpg" width="300" /></p>
<p>Partitioning going up in toilet area to create 3 separate toilets</p>
<p><img src="/_data/site/43/pg/271/8Stonecutoutfortoiletventilation.jpg" width="300" /></p>
<p>Some stonework temporarily removed in install ventilation duct from toilet</p>
<p><img src="/_data/site/43/pg/271/9lightsinsaisle.jpg" width="300" /></p>
<p>Uplighters installed on S wall of South Aisle</p>
<p><img src="/_data/site/43/pg/271/10lightsinstnick.jpg" width="300" /></p>
<p>Spotlights installed in St Nicholas Chapel (similar arrangement in all 4 corners of chapel)</p>
<p><img src="/_data/site/43/pg/271/11TestingnewlightsinChancel.jpg" width="300" /></p>
<p>Testing new lights in the Chancel</p>
<p><img src="/_data/site/43/pg/271/12ExtrascaffoldboardsinplaceforRCscreeninstallation.jpg" width="300" /></p>
<p>Extra scaffold platform created ready for installation of the Ringing Chamber screen.</p>
<p><img src="/_data/site/43/pg/271/13HeavyliftingforWscreenmetalwork.jpg" width="300" /></p>
<p>Heavy lifting gear brought in the erect the steelwork for the Ringing Chamber screen</p>
<p><img src="/_data/site/43/pg/271/14Westscreenmetalworkinplace.jpg" width="300" /></p>
<p>Steelwork in place for Ringing Chamber - delivered and installed the same day!</p>
<p><img src="/_data/site/43/pg/271/15Newboilerdelivered.jpg" width="300" /></p>
<p>New boiler delivered</p>
<p>&nbsp;</p>]]></description>
<link>https://www.stmaryspurton.org.uk:443/271/December-2020-photos</link>
<enclosure url="https://www.stmaryspurton.org.uk:443/cache/img/43/pg|271&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg6819ea715a&amp;ft1608404390&amp;14Westscreenmetalworkinplace.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Nov 2020 photos</title>
<guid isPermaLink="false">stmaryspurton_10187</guid>
<pubDate>Sun, 22 Nov 2020 13:28:47 +0000</pubDate>
<description><![CDATA[<p><img src="/_data/site/43/pg/257/IMG_20201104_100104072.jpg" width="300" /></p>
<p>Chases cut in the wall plaster to take lighting cables for the new lights.</p>
<p>&nbsp;<img src="/_data/site/43/pg/257/IMG_20201112_142610647.jpg" width="300" /></p>
<p>Plaster on the south wall of the St Nicholas chapel was very degraded and had to be removed.&nbsp;</p>
<p><img src="/_data/site/43/pg/257/IMG_20201112_143032932.jpg" width="300" /></p>
<p>Joists installed for the new floor in the toilet area making this floor level with the Nave floor. The start of pipework for the three new toilets!&nbsp;</p>
<p><img src="/_data/site/43/pg/257/IMG_20201116_132251348.jpg" width="300" /></p>
<p>&nbsp;The new roof in the toilet area from below. The roof had to be raised because the floor has been raised to make it level with the Nave floor.&nbsp;</p>
<p><img src="/_data/site/43/pg/257/IMG_20201126_095515266.jpg" width="300" /></p>
<p>The new roof in the toilet area from above.</p>
<p>&nbsp;<img src="/_data/site/43/pg/257/IMG_20201126_094257694.jpg" width="300" /></p>
<p>Later in November work begins on the partitioning in the toilet area.</p>
<p>&nbsp;<img src="/_data/site/43/pg/257/IMG_0067comp.jpg" width="300" /></p>
<p>An area of damaged plaster removed in the NE corner of the North Aisle revealing lathe just below the ceiling. The photo also shows a hole that was opened up in the ceiling to explore a new rainwater leak.&nbsp;The leak has now been fixed and the lathe and plaster ceiling will be restored.&nbsp;</p>
<p><img src="/_data/site/43/pg/257/IMG_20201116_132947889.jpg" width="300" /></p>
<p>Scaffolding everywhere! This view is from high in the crossing above the choir stalls looking back to the west end of the Nave. All ceilings and walls are now accessible for the work on lighting, cleaning, plaster repairs and lime-washing - all this work is scheduled for completion before the Christmas break.&nbsp;</p>
<p><img src="/_data/site/43/pg/257/IMG_20201126_095929373.jpg" width="300" /></p>
<p>&nbsp;Some external mortar repairs on the north wall</p>]]></description>
<link>https://www.stmaryspurton.org.uk:443/257/Nov-2020-photos</link>
<enclosure url="https://www.stmaryspurton.org.uk:443/cache/img/43/pg|257&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg8e52a18a37&amp;ft1606051792&amp;IMG_20201112_143032932.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Oct 2020 photos</title>
<guid isPermaLink="false">stmaryspurton_9755</guid>
<pubDate>Thu, 15 Oct 2020 17:03:19 +0100</pubDate>
<description><![CDATA[<p><img src="/_data/site/43/folder/231/IMG_20201014_130926455_HDRcomp.jpg" width="311" height="414" /></p>
<p>Old boiler house now empty after boiler removal</p>
<p><img src="/_data/site/43/folder/231/IMG_20201014_130938239_HDRcomp.jpg" alt="Wall between old boiler house and toilet now demolished" width="309" height="412" /></p>
<p>Wall between old boiler house and toilet now demolished</p>
<p><img src="/_data/site/43/folder/231/IMG_20201014_142347668comp.jpg" width="300" /></p>
<p>Removing the roof of the old boiler house/toilet</p>
<p><img src="/_data/site/43/folder/231/IMG_20201014_131924474_HDRcomp.jpg" width="300" /></p>
<p>3-level birdcage scaffolding in the chancel/sanctuary area</p>
<p><img src="/_data/site/43/folder/231/IMG_20201014_134256432comp.jpg" width="300" /></p>
<p>Discussing cable routes for new lighting in the Nave</p>
<p><img src="/_data/site/43/folder/231/IMG_20201014_134704514comp.jpg" width="300" /></p>
<p>Scaffolding complete on the N aisle and N side of Nave</p>
<p><img src="/_data/site/43/folder/231/IMG_20201014_135129189comp.jpg" width="300" /></p>
<p>1st level platform in Nave</p>
<p><img src="/_data/site/43/folder/231/IMG_20201014_141718019comp.jpg" width="300" height="225" /></p>
<p>Inspecting access to front of sanctuary</p>
<p><img src="/_data/site/43/pg/232/20201019_preparingtocutdoorwaytonewtoilet.jpg" width="308" height="283" /></p>
<p>Installing temporary supports under window at back of Nave in preparation for cutting new doorway into toilet.</p>
<p><img src="/_data/site/43/pg/232/20201028_installingnewlightingcablesabovewallplateinchancelandchasingoutfornewlights.jpg" width="327" height="245" /></p>
<p>Installing new lighting cables above wall-plate in chancel and chasing out for new lights</p>
<p><img src="/_data/site/43/pg/232/20201028_someoftheplasterwaorkthatwillneedrepairing.jpg" width="339" height="254" /></p>
<p>Some plasterwork that will need repairing!</p>
<p><img src="/_data/site/43/pg/232/20201030_ceilinginNaveaftercleaning2-alllookingingoodcondition.jpg" width="348" height="261" /></p>
<p>Nave ceiling after cleaning - looks in good condition!</p>
<p><img src="/_data/site/43/pg/232/20201030_doorwayopeningbetweenNaveandtoiletcompleted.jpg" width="347" height="260" /></p>
<p>The new opening between the Nave and the toilet block is safely completed.</p>
<p><img src="/_data/site/43/pg/232/20201030_heatingpipescomingintonewtoiletblockfromboilerhouseinshed.jpg" width="344" height="258" /></p>
<p>View inside new toilet block (which combines the old toilet area on the left and the old boiler room on the right). Heating pipes coming from the new boiler in the shed can be seen.</p>]]></description>
<link>https://www.stmaryspurton.org.uk:443/232/Oct-2020-photos</link>
<enclosure url="https://www.stmaryspurton.org.uk:443/cache/img/43/pg|232&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg48a1b69b18&amp;ft1602778198&amp;IMG_20201014_131113058_HDRcomp.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Sep 2020 photos</title>
<guid isPermaLink="false">stmaryspurton_9445</guid>
<pubDate>Thu, 01 Oct 2020 20:46:51 +0100</pubDate>
<description><![CDATA[<p>&nbsp;</p>
<p><img src="/_data/site/43/pg/222/IMG_20200904_160203759.jpg" width="400" /></p>
<p>Final clean-up before Open Days</p>
<p><img src="/_data/site/43/pg/222/IMG_20200906_164919048.jpg" width="400" /></p>
<p>&nbsp;Church ready for Open Days wb 7th September</p>
<p>&nbsp;<img src="/_data/site/43/pg/222/IMG_20200929_130522570_HDR.jpg" width="400" /></p>
<p>Trenching for heating pipes from new boiler house (in shed!)</p>
<p><img src="/_data/site/43/pg/222/IMG_20200929_130703239_HDR.jpg" width="400" /></p>
<p>Covid hand-washing station at West door.</p>
<p><img src="/_data/site/43/pg/222/IMG_20200929_130839014_HDR.jpg" width="400" /></p>
<p>Choir Vestry converted into site office/canteen</p>
<p><img src="/_data/site/43/pg/222/IMG_20200929_131350869_HDR.jpg" width="400" /></p>
<p>Protection for all monuments and wall paintings</p>
<p>&nbsp;<img src="/_data/site/43/pg/222/IMG_20200929_131501126_HDR.jpg" width="400" /></p>
<p>Protection for West Screen and Font</p>
<p><img src="/_data/site/43/pg/222/IMG_20200929_131941082_HDR.jpg" width="400" /></p>
<p>Excavations for kitchen drainage and cable runs.</p>
<p><img src="/_data/site/43/pg/222/IMG_20200929_132025597_HDR.jpg" width="400" /></p>
<p>Floorboards removed for services in NW corner of Nave.</p>
<p><img src="/_data/site/43/pg/222/IMG_20200929_132106286_HDR.jpg" width="400" /></p>
<p>Old radiators removed for refurbishment.</p>
<p><img src="/_data/site/43/pg/222/IMG_20200929_134715310.jpg" width="400" /></p>
<p>Start of the birdcage scaffold being erected in the Sanctuary.</p>]]></description>
<link>https://www.stmaryspurton.org.uk:443/222/Sep-2020-photos</link>
<enclosure url="https://www.stmaryspurton.org.uk:443/cache/img/43/pg|222&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg63fca68785&amp;ft1601587759&amp;IMG_20200904_160203759.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Pre-contract Renewal photos</title>
<guid isPermaLink="false">stmaryspurton_8226</guid>
<pubDate>Mon, 25 May 2020 22:15:37 +0100</pubDate>
<description><![CDATA[<p>These photos were taken before September 2020 and show some of the preparations carried out by church volunteers before the main contract started.</p>
<p>Mobiles: Tap on a photo to see caption; swipe to scroll through.</p>
<p>Laptop/PC: Click on a photo to see caption; click again to scroll through.</p>]]></description>
<link>https://www.stmaryspurton.org.uk:443/152/Pre-contract-Renewal-photos</link>
<enclosure url="https://www.stmaryspurton.org.uk:443/cache/img/43/pg|152&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg59d38fb0d7&amp;ft1601586685&amp;IMG_20200309_123759034.jpg" length="100" type="image/jpg" />
</item>

</channel>
</rss>